Construction and interior fit-out of a 4,500 SF café and coffee bar with food lockers on the first floor of the 101 College Street building. Minor demolition was required to connect all MEP/FP systems to new existing systems.

Construction and interior fit-out of a 4,500 SF café and coffee bar with food lockers on the first floor of the 101 College Street building. Minor demolition was required to connect all MEP/FP systems to new existing systems.
Project gallery




